For this document, it is assumed that a minimum of two people are present at the firing:

  • The Firing Director (FD)
  • The Safety Officer (SO)

However, it is suggested that the following people be present as well:

  • The Operations Overseer (OO)
  • The Data Recorder (DR)

For more on the positions, see Responsibilities of the Rail Gun Team.

    • Turn off and unplug power supply.

    • Turn on the resistor banks.

    • Turn off injector system.

    • Wait four (4) minutes for the capacitors to discharge into the resistors.

    • Pull pin for manual discharge release.

    • Unplug all boxes and wires in the control room.

    • Follow the procedure for a normal shutdown as detailed in Post Firing.